home
introduction competence working method projects contact
phase B/C
design and engineering
intro case 1 case 2 case 3
phase O A B C D
activities
design and engineering of main external parts and controls, in co-operation with client’s internal engineering department.
development of smart control for detector manipulation: force direction on hand control defines movement direction of detector.